So on Friday night Brad came over to help me rip up all the carpet in my place....man the dust was brutal so dusty in here.
On Saturday Lee and Tanya came over to lay the new laminate floor down. It took us from 11am till 9pm to lay the floor down. We had some tricky parts in the floor and once we figured out the best to click the floor together it was smooth sailing. If it wasn't for Brad coming over on Friday night to help rip up the carpet, the floor would have not been finished in one day. THANK YOU SO MUCH BRAD :)
I can't thank Lee and Tanya enough for all their help on Saturday to push to get it done too :)
We still need to put the 1/4 round down but at least the floor is all in and with just enough laminate we almost had to run out and get another box.
I love the new floor looks awesome and chic :)